Wind Farm Specialty Welding Cable Repair

Home > Projects > Wind Farm Specialty Welding Cable Repair

Summary:

When this wind farm experienced a conductor failure inside one of their turbines 200’ in the air, they relied on EBI’s emergency response team for expedited fabrication and repair.

Scope of Work:

  • Removed damaged conductor bar for repair
  • Fabricated new conductor bar
  • Replaced damaged conductor end with adapter and welded in place
  • Re-installed offset piece of bus and applied heat shrink to terminations

There has been a growing number of medium voltage cable failures at wind farms across the United States. Many of these failures have adversely affected wind farm operating costs and reliability. If your solar fleet has a similar cable failure, rely on EBI's emergency response team to get you back up and running.

Project Details

Plant Type:Wind
Plant Size:152.2 MW
Plant Location:Iowa
EBI Job #3606
JPR Score

More Projects

20240801_150753

Emergent Transformer Change-Out & IPB Repair

20240814_211822027_iOS

System Critical Asset Life Extension to Support Data Center Project

20240129_150152

Non-Seg Refurbishment to Support Transformer Change-Out

IMG_1601_Edited

Non-Segregated Bus Refurbishment

Cable Bus

Cable Bus Installation

2598 Shawville Before

Disconnect Switch Fabrication

IPB Exterior Photo

Nuclear Extended Power Uprate

IMG_3180

Mini Bus Installation

IMG_2048

IPB Mods & Fabrication for Transformer Change-Out

Request a Quote

Ready to Start Your Next Project?