Summary:
This is an ongoing project, check back for more details as we complete this exciting project!
EBI collaborated with this client to restore a retired plant's isolated phase bus duct system to full operable condition, ensuring it could meet the high power demands of a near by data center. Data centers require vast amounts of electricity to support their servers, cooling systems, and backup infrastructure, making reliable power distribution systems essential. By revitalizing the plant's electrical infrastructure, EBI helped the client ensure consistent, uninterrupted power for this energy-intensive facility.
Scope of Work:
- Refurbished the mating surfaces on 6 IPB ends and 1 Paddle on the GCB
- Modified the PT cabinet
- Cryogenically cleaned PT cab and all existing indoor IPB runs
- Gathered measurements on the GCB braids and shunts
- Welded shunts on the GCB and enclosure
- Installed FME on GCB opening, Gen, openings and outdoor IPB ends at wall plate
- Installed steel for transformers
- Modified the generator cabinet and welded the conductor at the generator cabinet
- Repaired the outside severed isophase bus at the existing wall plate
- Set the doghouses on the transformers
- Set and aligned IPB sections
- Removed the existing PT cabinet on the GSU side of the GCB and modify the PT cabinet on the generator side of the GCB while performing necessary welds
- Completed a final DC Hi-Pot acceptance test of the IPB per IEEE standards
- Installed braids at the transformers and the GCB
- Installed sets of load break switch platforms at the transformer
- Set and aligned load break switch at the transformer
In today’s rapidly expanding digital world, reliable power is essential. EBI provides life extension solutions for system-critical electrical assets, ensuring your operations run smoothly and securely. As experts in power plant maintenance, we help you keep pace with growth while maximizing the lifespan of your electrical systems. If you have similar project needs, contact us today.
Project Details
Plant Type: | Data Center |
Plant Size: | Previously 686 MW |
Plant Location: | New York |
EBI Job # | 3757/3799 |
Testimonial
"Check Back as we wrap up this project"
TBD
TBD