It is hard to believe 2024 is nearly upon us. The new year allows us to reflect both on our past and look toward our future. 2024 will mark EBI’s...
Read More
“I am very satisfied with the work done by EBI. The expertise and quality of workmanship is outstanding. EBI’s expertise was obvious on this work with multiple suggestions made that...
Read More
PROJECT SPOTLIGHT: For nearly 50 years, power generation and utility clients across the nation, have turned to EBI’s extensive bus duct expertise to extend the life of their system critical...
Read More
“Really enjoyed having EBI onsite, look forward to future. Got along great with guys. Worked safely and was signed onto our LOTO Box. Was on time, no issues. Online meetings...
Read More
PROJECT SPOTLIGHT: During this project, EBI arrived on site to assess a non-segregated bus system that appeared degraded and was failing a megger test. Due to the poor condition and...
Read More
“Best IPB contractor that I have seen at any of our generation stations. Flexible and adaptable to unexpected circumstances and or changes. Quality of work was above and beyond. EBI...
Read More
PROJECT SPOTLIGHT: When this plant experienced a breaker failure due to improper grounding, EBI was called in for an emergent offline visual inspection and cryogenic cleaning of the isolated phase...
Read More
There is much buzz about the nationwide shortage of readily available transformers. It is important to note that a ‘like-for-like’ exchange will be nearly impossible for unplanned outages. As such,...
Read More
Purpose/Function & Method Application of a Weld on Isophase Bus The purpose of having a good quality weld on joints is to provide a smooth transition of power across the...
Read More
Since 1974, power generation and utility clients across North American and beyond, have turned to EBI’s nearly 50 years of extensive bus duct expertise to extend the life of their...
Read More